Contact

Ph: 306-931-6626

Fax: 306-933-3166

Email:

HAMM Construction- Water Treatment Plant River Crossing Pipeline

The Water Treatment Plant River Crossing Pipeline was completed for the City of Saskatoon.

» 366 lineal meters of 1500mm Polyurethane Lined and Coated Steel Pipe.
» Construction of this project was achieved using a coffer dam method.
» Average cut was 4.5 meters below riverbed.

 

 

 

 

         

                                                                

 

         

                                                                 

 
 
  
 

Celebrating 1,344,500 No Lost Time Manhours